![]() The tender documents will generally define the buildings that will be covered by the works, the term over which works may be required (often between one and five years), an estimate of the likely total value of the works that will be required over the term and an estimate of the likely size of individual orders. Serial Tendering Method: Under this, preparation of bid proposal is based on bill of quantities or schedule work. Appointment is based on an agreed schedule of rates related to the categories of work that are likely to form part of the programme. Serial tendering may used where the client has a regular programme of works that they would like to be undertaken by a single contractor, often minor works, repetitive works (such as housing) or maintenance work. Where this is the case the original competitive tender will serve as a framework. ![]() It is often used for clients who have a number of phases of similar work. Single sourcing is also known as single-source publishing because it uses a sole resource for using and reusing information. The rates submitted can then be used to value works over a series of similar projects, often for a fixed period of time following which the tender procedure may be repeated. Advantages And Disadvantages Of Ict Serial tendering is more of a hybrid/advanced method tendering which combines a normal competitive tender (whether single or two-stage) with negotiation. Serial Tendering Advantages And Disadvantages Manual Or Online The user can use this single paper or document in different formats to create manual or online texts or papers. Serial Tendering By Kyle Levett What is it? Serial tendering generally involves the preparation of tenders based on a typical or notional bill of quantities or schedule of works.
0 Comments
Leave a Reply. |